Projects / Bowers & Son bunker floor

BOWERS & SON
BUNKER FLOOR.

Power-trowel finisher mid-pass on a bunker floor for Bowers and Son Ltd

Bunker floor for Bowers & Son Ltd. Poured, finished and cut, all in the same week.

This is the kind of rural commercial pour where the surface needs to handle gear and the finish needs to last. The pour ran with the full crew, the screed worked back across the slab and the power-trowel followed once the surface was firm enough to walk on.

Saw-cut joints went in before the surface fully set, locking in the panels and stopping random cracking down the line. Quick throwback to the job getting done on site, on time, to spec.

  • Bunker floor pour for Bowers & Son Ltd
  • Power-trowel finish on the day
  • Saw-cut joints before surface set
  • Single-week turnaround
Mack truck on the slab at sunset, screed working back across the surface
Sunset over a poured shed slab with steel frame above
Drone aerial of a separate commercial slab pour, Te Awamutu
All projects Request a quote